Buying Guide · 6 min read · Updated 2026-06

Insulation for New Construction: Spec Checklist

Building new? Insulation is the cheapest energy upgrade you'll ever make. Here's how to spec it right the first time.

Code minimum vs. high performance

2021 IECC requires roughly R-49 attics, R-20 walls, and R-30 floors in most climate zones. Code minimum is the floor, not the goal — adding 2-3 R-values in the walls and pushing the attic to R-60 typically adds <$0.50/sq ft to a new build.

What to spec

Attic: R-49 to R-60 blown cellulose with full air sealing of the top plate and penetrations

Walls: R-21 batts or R-23 dense-pack cellulose, plus R-5 continuous exterior rigid foam

Crawl space: encapsulated with R-15 closed-cell spray foam on foundation walls

Rim joist: 2" closed-cell spray foam (one of the largest air leak points)

Blower-door target: ≤ 3 ACH50 (code is ≤ 5 ACH50 in most zones)

Contractor questions

Can you provide a blower-door test result after rough-in?

Do you air-seal before insulating, or does the framer handle it?

What's your QA on spray foam thickness and temperature at install?

Will you supply manufacturer specs and warranty in writing?

Frequently asked questions

Related services

Keep reading